Chubu Steel Plate Co., Ltd.

Company

Corporate History

  • From establishment to 1970s
  • 1980s to 1990s
  • 2000s
1950
The first Atsuta works is established.
The company starts as the only Steel Plate Rolling Mill in Tokai region.
The company building at that time
The company building at that time
1950
The company begins operation as the only steel plate rolling mill in Tokai Region.
1952
Head office moves to Atsuta works.
1953
The company starts to produce steel checker plate.
1956
Two 5 ton EAFs are equipped in Atsuta works.
5 ton EAF
5 ton EAF
1956
15 ton EAF is equipped in Atsuta works.
1957
A new Nakagawa works is established, equipped with 3-High rolling Mill.
Nakagawa works
Nakagawa works
1958
Head office moves to Nakagawa works.
1959
Two 30 ton EAFs are equipped in Nakagawa works.
30 ton EAF
30 ton EAF
1961
Chubu Steel Plate Co., Ltd.’s stocks are offered in Nagoya over-the-counter market.
1961
Additional 3-High rolling Mill is equipped in Nakagawa works.
1961
Chubu Steel Plate Co., Ltd. is listed on the Second Section of the Nagoya Stock Exchange.
1962
Additional 200 ton EAF is equipped in Nakagawa works.
200 ton EAF
200 ton EAF
1963
Tokyo sales office is established.
1963
Chubu Steel Plate receives the award of director-general of Chubu Bureau of Economy, Trade and Industry(former Nagoya Bureau of Economy, Trade and Industry) for the Excellent Factory Implementation of Industrial Standardization.
1965
Osaka sales office is established.
1966
Atsuta works is closed.
1967
The company starts steel plate processing business.
Steel plate processing work
Steel plate processing work
1967
Meitoku Engineering Co., Ltd. is established to transfer equipment maintenance tasks from Chubu Steel Plate Co., Ltd.
Meitoku Engineering Co., Ltd.
Meitoku Engineering Co., Ltd.
1968
Steel processing division is accredited as designated steel shearing mill by Nippon Steel Corporation(former Yawata Iron & Steel Co., Ltd.).
1972
Chuko Corporation and golf driving range are established.
Golf driving range at that time
Golf driving range at that time
1974
Chubu Steel Plate Co., Ltd. is listed on the First Section of the Nagoya Stock Exchange.
1982
Continuous Caster is installed in Steel-making Shop.
Continuous Caster
Continuous Caster
1986
3-High rolling Mill in Rolling Shop is replaced with 4-High rolling Mill.
4-High Rolling Shop
4-High Rolling Shop
1987
Hot leveler in Rolling Shop is revamped.
1989
Electromagnetic stirrer is installed in Continuous Caster.
1990
Ladle Furnace is installed in Steel-making Shop.
Ladle Furnace
Ladle Furnace
1990
200 ton EAF is modified with EBT(Eccentric Bottom Tapping) system.
End Shear in Rolling Shop is revamped.
1990
The new Scrap warehouse is constructed.
1991
CK Corporation, Ltd. is established as trading company.
1992
Cooling Bed(cooling equipment for steel plate after rolling) in Rolling Shop is expanded.
The new central control room for EAF is completed.
1994
CK Clean AD, Ltd. is established to commence planning and production of advertising signs, and grease-filters rental work.
1994
Existing Reheating furnace in Rolling Shop is replaced with The walking-beam type reheating furnace.
1997
6KW laser-cutting machine is installed in Steel-processing Shop.
1997
CK Logistics Co., Ltd. is established for storage work of hazardous goods.
storage for hazardous goods
storage for hazardous goods
1997
The company expands business by establishing Mamex corporation focusing on manufacturing and selling of frozen tofu.
1998
Vertical Edger is equipped to 4-High rolling mill in Rolling Shop.
Chubu Steel Plate Co., Ltd. obtains ISO9002 certification.
Vertical Edger
Vertical Edger
1999
6KW laser-cutting machine is added in Steel-processing Shop.
2000
PSS wing with slag/PSS management equipment is constructed.
2002
Chubu Steel Plate Co., Ltd. obtains ISO9001 certification.
2003
Continuous Caster in Steel-making Shop is revamped.
Continuous Caster
Continuous Caster
2005
Two plasma-cutting machines are installed in Steel-processing Shop.
Plasma-cutting machine
Plasma-cutting machine
2005
Golf driving range is closed down.
2006
Scrap warehouse is expanded.
Expanded Scrap warehouse
Expanded Scrap warehouse
2006
Chubu Steel Plate Co., Ltd. obtains ISO14001 certification.
2006
Coherent burner on EAF in Steel-making Shop is revamped.
2007
The company sells Mamex Corporation.
2007
Rolling Shop is expanded with installation of 2000t Press.
Expanded Rolling Shop
Expanded Rolling Shop
2008
Cooling-bed in Rolling Shop is extended.
2009
A plasma-cutting machine is added in Steel-processing Shop.
2009
Rolling process line is revamped, equipped with improved Regenerative Burner-type reheating furnace and mill motor.
Regenerative Burner-type Reheating furnace
Regenerative Burner-type
Reheating furnace
2010
Chuko Corporation is dissolved.
2010
The company withdraws from medical waste treatment business.
2010
The company withdraws from selling and receiving orders of steel checker plate.
2010
Construction for improving earthquake resistance of Rolling Shop facility is carried out.
2010
4-High rolling Mill is revamped.
4-High rolling Mill
4-High rolling Mill
2012
Slag disposal site in Steel-making Shop is newly constructed.
2012
New cold leveler in Rolling Shop operates.
2013
The new building of manufacturing base is completed.
2013
Continuous Caster maintenance shop is newly constructed.
2015
Construction for improving earthquake resistance of Steel-making Shop facility is carried out.
2015
MEITOKU ENGINEERING VIETNAM CO., LTD is established.
2016
The dust collector for EAF improves energy efficiency.
2017
Chubu Steel Plate Co., Ltd. obtains ISO9001 certification.
2018
Chubu Steel Plate Co., Ltd. obtains ISO14001 certification.
2021
Chubu Steel Plate Co., Ltd. transfers to the company with an Audit and Supervisory committee.
2021
Chubu Steel Plate Co., Ltd. transfers entire equity interest in MEITOKU ENGINEERING VIETNAM CO.,LTD.
2022
Chubu Steel Plate Co., Ltd. is listed on the Prime Market of Tokyo Stock Exchange.